Biotech * Casinos * Commercial Kitchens * Energy Conservation Studies * Hospitals * Industrial Piping
Industrial Exhaust * Lab Exhaust * Laundry Exhaust * Office Buildings * Restaurants * Schools
Semiconductor Industry * Wood Shop Exhaust
Alza 209: Installation of new Laser
Process cooling water, CDA to new Laser equipment. Exhaust from Laser through a bag-in-bag-out mechanism, with 99.99% HEPA filters.
Roche Ointment Addition
Steam, Domestic water, De-ionized water, Carbon Dioxide, and Nitrogen to new Ointment equipment; New compressor hook up to pneumatic controls.
Nugget Casino Expansion
Design of Dual Duct Constant Volume System with 100 tons Gas/Electric Packaged unit with Economizer.
Cal State Fullerton, Desert Studies Center
UTC Stations 210 and 211
AKU Hospital Kitchen Ventilation
Design for Exhaust hood performance improvement, New packaged AC units.
Methodist Hospital Patient Tower Replacement
Design of Dual Duct Constant Volume System, addition of new Centrifugal chiller, boiler, and pumps.
DHA Hospital
Central Plant layout; Air Conditioning of Operation Theaters, Isolation Rooms, Patient Rooms, and Filter Clinic.
Los Altos Hospital
Renovation work to provide motorized dampers on ducts, for capacity redistribution.
Heat removal from electric ovens, using cooling towers and circulating pumps.
Fume Hood Relocation and selection of exhaust fan selection.
Lockheed Paint Booth VOC controlFeasibility study on the use of Incinerator vs. Activated Carbon Filter options for VOC control.
GA Textile Dyeing and Bleaching Area ventilationDesign of natural cooling system through intake and exhaust fans.
Design of HVAC system with close temperature and humidity tolerances.
UTC 1210 Chemical Lab RenovationRenovation of HVAC system of the Chemical Lab.
Make-up air supply for new dryers, New Air Handling unit
AKU Laundry RenovationCooling using fresh air: Filters on air intake spaces, Wall-mounted propeller fans for exhaust, Fresh air unit for spot cooling.
Design of Dual Duct Variable Air Volume System with Minimum Air VAV boxes, Variable Frequency Drives on fans, and DDC controls.
OCC Central Plant RenovationReplacement of Reciprocating Chiller, Chilled water pumps, Condenser water pumps, Air Handling Units, and Cooling Towers.
Design of HVAC system: Ceiling-mounted DX Fan Coil Units with remote condensing units, Tempered Air Unit; Compensating Exhaust Hoods in Kitchen
Package AC units for individual classrooms.
UC Berkeley Lewis Hall RenovationRenovation of Chemistry Labs. Installation of AHUs, chilled water pump, heat exchanger, hot water pump, and air distribution system
Installation and Removal of 250mm Tools.
Installation of tools in the new Wet Lab.
Installation of new Sulfuric Acid pump for Scrubber.
RDesign of Ammonia Bulk Storage System.
Automation of HF Waste treatment plant.
Design of Slurry delivery system.
Redundant AC units and their controls; air-distribution through custom-made diffusers.
Office Pacific Wood Shop Exhaust System.